This monster halftrack was the largest of the German Army’s prime movers and was originally developed as a heavy recovery tractor. With it’s 250hp V12 Maybach motor it could tow 18ton’s of disabled tank and three linked together could even tow a Tiger IE uphill. Some 2500 of these huge vehicles were built between 1939 and 1944 and were used as the basis of several variants as well.